Northwest Kidney Centers Bellevue Clinic Photo Gallery
Project Details
Overcoming Adverse Conditions to Keep
Facility Operational
This tenant improvement/expansion project included a new 6,800-SF two-story addition to the main entry and multi-phased renovations to the existing dialysis clinic while keeping the facility fully operational. In addition, a refresh of the remaining 4,223-SF was completed to bring the project up to current NKC standards. An intricate schedule and stringent infection control protocols ensured key common spaces remained accessible during construction and allowed for the dialysis clinic to continue seeing patients.
A complete upgrade of the dialysis treatment equipment required coordination with NKC to transition equipment over three separate off-hour utility shutdowns. Aldrich orchestrated the successful delivery of the facility with zero impacts to the existing clinic overcoming adverse weather, COVID-19, and numerous unforeseen challenges with the existing building.
The NKC Bellevue Dialysis Clinic project is featured in our blog: Dedicated Health + Science Contractor